Shams Green Transformation Project aims to integrated solid Waste Management through four core stages
Phase 1: Sorting |
Unit data and business instructions
1. Waste reception unit before sorting area 2 meters by 2 meters
2. Unit height from earth 90 cm
3. Trend variable sorting workflow
4. 220 volt operating voltage difference
5. Business guidelines
– Occupational prevention and safety tasks are worn
– Screening workflow for 4 people
– The progress of the hatchery allows the horns of four main residues (paper- plastic - organic residues - treasure)
Phase 2: Collecting waste |
Unit data and business instructions
1. 4 containers
2. Capacity per container 400 liters
3. Each container is for a specific type of waste
4. Paper - Organic Waste - Plastic - Treasure
5. Operating steps:
– Materials are received
– Occupational prevention and safety tasks are worn
– Each material is placed in its designated container
– It is confirmed that the container capacity is suitable for the waste compartment and in case of increased waste volume is transferred to another warehouse prepared for it
Stage 3: Abs |
Unit data and operating instructions
1. 100-litre piston unit capacity
2. Hydraulic piston capacity 5 hp
3. Voltage difference used 380 volts
4. Unit dimensions approximately: 1.5 meters wide, 1 meter depth and 2.5 meters height
5. How to run
– Occupational prevention and safety tasks are worn
– Waste is processed and plastic sheeting removed from containers for the safety of workers
– The appropriate volume of waste is made inside the piston
– Make sure connections and hoses are safe before operation
– It's powered by an electric key.
– The movement of the piston is controlled by the control implant
– Waste is pressed well.
– The piston is lifted to the first position.
– Residues are removed after the piston
– The suppressed waste is well collected and easily stored and transported
Phase 4: Recycling |
Unit data and operating instructions
1. Unit capacity 3 basins
2. Capacity per basin 200 liters
3. Each basin has a capacity of about 100 to 300 worm larvae.
4. Approximate unit dimensions: 1.5 meters wide, 1 meter length and 0.3 meters depth
5. How to run
* Occupational prevention and safety tasks are worn
– Waste is processed and plastic or paper waste removed
– The appropriate volume of waste is made inside each basin
– An appropriate amount of water is placed
– Docks are left for 10 to 15 days for the breeding agent of worms
– Tea composte product is extracted
– Organic fertilizer consisting of basins is produced every 15 days
|
To Know More About Shams Be Green Unit click here |