logo

A S U

Welcome to Ain Shams University

Engineering Consultancy Centre

2025-06-12

Center Objectives:

The center provides all types of integrated engineering consultations, research, and studies aimed at solving problems facing various engineering and industrial fields. This includes developing and creating new methods, training and retraining, and strengthening cultural and scientific ties with local and international universities and public institutions.

The center achieves its objectives through the expertise of faculty members, assistant lecturers, and teaching assistants in the faculty. It relies on the laboratory capabilities available within the faculty and continuously seeks to support them with the latest equipment and technologies.

The center also achieves its goals through its specialized units with distinct scopes.

Center Achievements:

Development of lecture halls in the Faculty of Law building.

Completion of renovation and efficiency upgrade works for the Youth Welfare Theater (Prof. Dr. Ouda Theater).

Supply and installation of 3 elevators for the Faculty of Veterinary Medicine.

Completion of the Chemistry Lab building at the Faculty of Science.

Restoration of balconies in Building (D) of the female student dormitory – Heliopolis.

Restoration of balconies in Buildings (E and B) and the dining hall roof in the female student dormitory – Heliopolis.

Reinforcement of the canopy, ground floor roof, and staircase in the central wing of the main building, and structural joint treatment at the Faculty of Women.

Inauguration of the Palace of Zafaran Museum.

Replacement and renewal of the water supply network and restrooms in the female student dormitory – Heliopolis (general site).

Development of Prof. Dr. Mahdi Allam Hall in the Faculty of Arts.

Equipping the ultrafast spectroscopic and dynamic measurement lab at the Faculty of Science.

Establishment of the Confucius Institute headquarters.

Photography room in the basement of the new administrative building.

Supply and installation of an elevator at the female student dormitory.

Rehabilitation of the fire pump station and tank at the female student dormitory, and creation of a fire safety system at the Faculty of Women.

Equipping the ultrafast spectroscopic and dynamic measurement lab at the Faculty of Science.

Student housing development project for the Olive and Nasr City branches (four buildings).

Replacement of flooring in the communal restroom of Building (C), restrooms on the ground and third floors of Building (A), and flooring in hallways and rooms on the ground floor of Building (A) due to deterioration.

“On Club” in the basement of the administrative building beneath the Military Education Administration.

Efficiency upgrade of restrooms across three floors in the Faculty of Environmental Studies and Childhood.

Project for the supply and installation of security surveillance cameras at the Technical Nursing Institute.

Replacement of 4 main electrical panels on the first and second floors of the Central Lab Building.

Collapse of marble in the administrative building of the Faculty of Education.

Roof insulation project for the Republic Building in the male student dormitory.

Installation of surveillance cameras in the Faculty of Arts.

Cracks and separations in the walls of Lab 3 and the Computer Science Lab on the second floor.

Aesthetic improvement and enhancement of greenhouses (Fish Farm – Vegetable Farm – Soil Department) at the Faculty of Agriculture.

Development of the main building and entrance of the Faculty of Women for Arts, Science, and Education (Botany Department).

Maintenance of the second-year Organic Chemistry Lab in the Genidi Building – Faculty of Science.

HVAC works at the Faculty of Pharmacy.

Wall cracks on the ground floor of the dormitory building.

Malfunction in the fire alarm panel in the new electricity room.

Renovation of the Faculty of Arts Hall (Azerbaijan Embassy).

Security surveillance cameras for the back fence of the Faculty of Medicine.

Replacement of a sewage line at the Faculty of Music Education.

Electrical grounding system installation at the Chemistry Lab in the Genidi Building – Faculty of Science.

Supply and installation of UPS devices at the Faculty of Nursing.

Renovation of the Student Affairs Administration and supply and installation of a canopy for the Alumni Administration (Quality Unit, Control Center, Legal Studies Center, and International Cooperation Center) as part of the development of Building (A) in the Faculty of Law.

Construction of emergency exits for both the internal and external parts of Lab 3 in the ground floor annex of the Faculty of Women.

Maintenance and efficiency upgrade of water tanks at the Faculty of Environmental Studies and Childhood.

Full audiovisual equipment installation for the lecture hall named after Prof. Dr. Abdel Ahad Gamal El-Din – Faculty of Law.

“On Club” in the basement of the administrative building beneath the Military Education Administration.

Project for the supply and installation of security surveillance cameras at the Technical Nursing Institute.

Collapse of marble in the administrative building of the Faculty of Education.

Installation of cameras in the Faculty of Arts.

Nominate one suitable person in the environmental field to review environmental performance reports for companies using coal or petroleum.

Requirements and scope of consultancy work for the union have been submitted.

Chemical tests on 3 samples.

Regarding the vertical expansion of the medical center building owned by the Cairo Drinking Water Company in Manial El-Roda, requested to be converted into a private hospital for company employees – CD.

Notification from the Egyptian National Committee on Metrology regarding magnetic resistance time measurement – please review and act accordingly.

Formation of specialized technical committees by the authority to serve as Egyptian national committees – kindly nominate a representative to join.

Request for approval of a certificate from Dr. Amr Abdelrahman’s office regarding Building 194 in New Cairo owned by MOPCO.

Invitation to submit technical and financial proposals for the design and supervision of a new educational building within the university campus.

Request to nominate a member to form an impartial committee to resolve a dispute concerning the contract between the Ministry of Civil Aviation and Hoss Lift Company for elevators.

Notification that the final draft of the Egyptian Code for High-rise Concrete Building Design has been issued (appendix to the original code).

Notification that the final draft of the Egyptian Code for Rainwater and Flood Systems Design has been issued (appendix to the original code).

Request for all preliminary designs completed for the Trillium Compound project in 6th of October City.

Invitations to participate in the tender for installation of iron works and preparation of description cards for 1570 residential plots in New Assiut City.

Structural safety report for the Beni Suef University Hospital extension.

Testing of agricultural drainage pipes according to the mentioned code specifications.

Approval of drawings for a 3000-liter tank.

Regarding Abdel Rahim Basha Al-Demerdash Palace and Mosque – request for implementation of the Standing Committee’s decision to mitigate risk – kindly issue instructions accordingly.

Regarding Luxor International Hospital – request for a technical report on the condition of works.

Fire alarm and automatic fire suppression system renovation for October 6th wholesale market buildings – please advise accordingly.

Request to form a civil engineering committee to inspect the ceiling collapse of Tut Hall at the JW Marriott Hotel – request a technical report.

Testing of steel rebar samples.

Request for a civil engineering committee to inspect and specify technical requirements for replacing the marble façade of the conference hall at the main headquarters.

Review and approval of the winch design, attached drawings, and structural calculations.

Project for Deshtout Water Station – 3 copies of the water hammer study by Prof. Dr. Ahmed El-Baz for the treated water pumping station (request for review and approval).

Request to send a bill of quantities and nominate major companies to proceed with procurement procedures for medical equipment for operating rooms, emergencies, and intensive care.

Feedback on securing and upgrading electrical panels based on the professor’s recommendation to protect staff.

Development of El-Demerdash clinics – the Medical City.

Endoscopy building – the Medical City.

New Emergency Hospital – the Medical City.

Efficiency upgrade of the façades of the Women’s and Obstetrics Hospital – the Medical City.

Pediatric Surgery Hospital – the Medical City.

Façades (Poison Center – Blood Bank – Nursing Institute) – the Medical City.

Blood Bank – the Medical City.

Fences and gates – the Medical City.

Al-Waily and Arab Al-Mohamady Gardens – the Medical City.

Al-Demerdash Garden – the Medical City.

Electrical work on the fourth floor of the Emergency Hospital.

Ceiling and beam reinforcement for the Women's Hospital capsule.

Second phase development of the sewage network at the New Children’s Hospital.

Equipping the Day Care Unit at the Geriatrics Hospital.

Development of the Intensive Care Unit in the Cardiology Department.

Price quote for inspection of cooling system pumps at the company’s port site in Abu Zenima.

Geriatrics Hospital (Martyr Ahmed Shawky) – fire safety works quotation after approval by Prof. Dr. Mohamed Abdel Baki, including an A3-sized drawing of the executive plans.

Heart Academy Basement (storage) – letter from Prof. Dr. Ibrahim Hilal regarding the approval of electrical materials, including catalogs.

Testing of steel rebar samples from Al-Nasr and Al-Ramaya stations.

Testing of steel rebar samples from the Hadaeq Al-Ahram station.

Structural condition report on the beams, girders, and slabs of the indoor arena stands – Prof. Amgad Talaat.

Construction of a staircase at the Internal Medicine Hospital.

Engineering report on inspection and evaluation of pumps at the company's seaport site.